 |  | Compressed Earth Block - Volume I. Manual of production (GTZ, 1995, 104 p.) |
 |  | (introduction...) |
 |  | Acknowledgements |
 |  | Preface |
 |  | Introduction |
 |  | Historical background |
 |  | Advantages of cebs |
 |  | Key questions |
 |  | Production |
 |  | Production lines |
 |  | The material |
 |  | Principle CEB characteristics |
 |  | Launching production |
 |  | The development of the material |
 |  | Earth - An architectural tradition |
 |  | Soil |
 |  | Soil for building purposes |
 |  | Properties |
 |  | Typical soils |
 |  | Behaviour of soils in the presence of water |
 |  | Hydrous states of a soil |
 |  | Prospecting |
 |  | Identification: Laboratory tests |
 |  | Identification: Field tests |
 |  | Stabilization |
 |  | General considerations |
 |  | Different ways of stabilizing and stabilizers |
 |  | Cement stabilization |
 |  | Lime stabilization |
 |  | Calculating how much stabilizer to use |
 |  | Equipment |
 |  | Selection criteria |
 |  | Products |
 |  | Uses |
 |  | Choosing a press |
 |  | Choosing soil preparation equipment |
 |  | Production layout |
 |  | Definition of the production line |
 |  | Types of equipment |
 |  | Manufacturing means |
 |  | Types of production line |
 |  | Investments |
 |  | Semi-mechanized brickworks |
 |  | Semi-mechanized brickworks with mobile presses |
 |  | Fully mechanized brickworks |
 |  | Production |
 |  | Soil extraction |
 |  | Transport |
 |  | Stocking raw materials |
 |  | Manual preparation |
 |  | Motorized preparation |
 |  | Measuring out |
 |  | Mixing |
 |  | Compressing the blocks |
 |  | Curing and drying |
 |  | Final pre-production operations |
 |  | ''Running in'' production period |
 |  | Production tests |
 |  | Interpreting results and tolerances |
 |  | Training production staff |
 |  | Quality controls |
 |  | (introduction...) |
 |  | Controlling raw materials |
 |  | Manufacturing controls |
 |  | Product control |
 |  | Organizational and equipment control |
 |  | How to carry out control operations |
 |  | Production management and economics |
 |  | Management |
 |  | Calculating costs |
 |  | Marketing |
 |  | Annexes |
 |  | Calculation of stabilizer quantity |
 |  | Block-breaking apparatus for use in brickworks |
 |  | Flat wheelbarrows |
 |  | Screen and measuring box |
 |  | Equipment for site tests |
 |  | Small laboratory equipment |
 |  | Examples of record sheet |
 |  | Bibliography |